Pre-delivery Commissioning
Hydraulic flow test, slew-bearing torque audit, and pilot pressure baseline are logged before the machine leaves the yard. Operating weight stickers, boom length plates, and load-moment indicator checks travel with the handover pack for your equipment manager.
Scheduled Field PM
Undercarriage track tension, Tier 4 Final emissions sampling, and boom pin & bushing rotation follow a 250 / 500 / 1000 hour cadence. Return-line filters are swapped against ISO 4406 cleanliness targets so hydraulic system pressure stays inside the OEM band.
Major Overhaul & Rebuild
Cylinder reseal, final-drive swap, and cab vibration calibration at the 8,000 hour window restore dig performance and protect residual value for fleet replacement planning.